Work Centre Loading

Motif Engineers Pvt. Ltd. — PPC Tool

Dashboard

Operation-Wise Work Centre Loading · 13-Week Rolling
Required Hrs Available Hrs (Regular)

Weekly Bottleneck Work Centre

The most-loaded work centre, per week, across the 13-week horizon.

Loading % Heat Map

All work centres × 13 weeks. Green <85% · Amber 85–100% · Red >100%.

Loading % Trend by Work Centre

13-week loading trend, one line per work centre.

Work Centre Master

Machines, shifts, OT capacity and rates. Everything downstream depends on this sheet.

Routing Master

One row per operation per part. WC Code / Alt WC dropdowns pull from WC Master.

13-Week Rolling Production Plan

Set the Week 1 start date once — every week header across the app shifts automatically.

Work Orders — Planned vs Actual

One row per part per week. Enter Actual Qty Completed as production is reported.

Operation-Wise Work Centre Loading

Auto-calculated from Routing Master × Production Plan. Read-only. Scroll right for all 13 weeks.

Work Centre Loading Summary

Weekly Required vs Available per work centre, OT feasibility, and 13-week totals. Read-only.

Data Validation Checks

Work Centre Loading — Shop Floor Noticeboard

Use the Print button above. This view is sized for one landscape page.